- Environmental Monitoring Report, December-2020, MPL 1X43 MW, Lumshnong
- Environmental Monitoring Report, December-2020, MPL 8 MW, Lumshnong
- Monthly Environmental Monitoring Report, December-2020, Khub Mine (4.85 Ha)
- Monthly Environmental Monitoring Report, December-2020, Khub Mine (9.66 Ha)
- Monthly Environmental Monitoring Report, December-2020, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, December-2020, SCL
- Monthly Environmental Monitoring Report, December-2020, SCML
- Monthly Environmental Monitoring Report, December-2020, Simon Sianghai Mine (4.97 Ha)
- Monthly Environmental Monitoring Report, December-2020, Wah Pynkon Limestone (13.58 Ha)
- SCML- EC-Compliance Report (Apr ’20 – Sep ’20)
- SCL- EC-Compliance Report (Apr ’20 – Sep ’20)
- MPL (43 MW) – EC Compliance Report (Apr ’20 – Sep ’20)
- Monthly Environmental Monitoring Report – November-2020, MPL (8MW)
- MPL (8 MW) – EC-Compliance Report (Apr ’20 – Sep ’20)
- 70 Ha – EC-Compliance Report (Apr ’20 – Sep ’20)
- 13.58 Ha – EC-Compliance Report (Apr ’20 – Sep ’20)
- 9.66 Ha – EC-Compliance Report (Apr ’20 – Sep ’20)
- Monthly Environmental Monitoring Report – November-2020, 4.97 Ha
- Monthly Environmental Monitoring Report – November-2020, 4.85 Ha
- SCML-EC-Compliance Report (Oct ’19-Mar ’20)
- SCL-EC-Compliance Report (Oct ’19-Mar ’20)
- 70 Ha- SCL-EC Compliance Report (Oct ’19-Mar ’20)
- 13.58 Ha- SCL-EC Compliance Report (Oct ’19-Mar ’20)
- 9.66 Ha- SCL-EC Compliance Report (Oct ’19-Mar ’20)
- Monthly Environmental Monitoring Report – October-2020, SCML
- Monthly Environmental Monitoring Report – October-2020, SCL
- Monthly Environmental Monitoring Report – October-2020, SCL (Khub-II)
- Monthly Environmental Monitoring Report – October-2020, SCL (Khub-I)
- Monthly Environmental Monitoring Report – October-2020, SCL (70 Ha)
- Monthly Environmental Monitoring Report – October-2020, SCL (13.58 Ha)
- Monthly Environmental Monitoring Report – October-2020, SCL (4.97 Ha)
- Monthly Environmental Monitoring Report – October-2020, SCL (4.85 Ha)
- Monthly Environmental Monitoring Report – October-2020, MTEPL
- Monthly Environmental Monitoring Report – October-2020, MPL 43 MW
- Monthly Environmental Monitoring Report – October-2020, MPL 8 MW
- Monthly Environmental Monitoring Report – September-2020, SCML
- Monthly Environmental Monitoring Report – September-2020, SCL
- Monthly Environmental Monitoring Report – September-2020, MTEPL
- Monthly Environmental Monitoring Report – September-2020, MPL 43 MW
- Monthly Environmental Monitoring Report – September-2020, MPL 8 MW
- Monthly Environmental Monitoring Report – September-2020, Mines 70.00
- Monthly Environmental Monitoring Report – September-2020, Mines 13.58
- Monthly Environmental Monitoring Report – September-2020, Mines 4.99 Ha (khub-I)
- Monthly Environmental Monitoring Report – September-2020, Mines 4.85 Hac
- Monthly Environmental Monitoring Report – September-2020, Mines 4.70 Ha (Khub-II)
- Environmental Monitoring Report – August-2019, MPL 1×43 MW, Lumshnong
- Monthly Environmental Monitoring Report, August-2020, Khub Mine (9.66 Ha)
- Monthly Environmental Monitoring Report, August-2020, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, August-2020, SCL
- Monthly Environmental Monitoring Report, August-2020, SCML
- Monthly Environmental Monitoring Report, August-2020, Wah Pynkon Limestone (13.58 Ha)
- Environmental Monitoring Report, June-2020, MPL 1X43 MW, Lumshnong
- Monthly Environmental Monitoring Report, June-2020, Khub Mine (9.66 Ha)
- Monthly Environmental Monitoring Report, June-2020, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, June-2020, SCL
- Monthly Environmental Monitoring Report, June-2020, SCML
- Monthly Environmental Monitoring Report, June-2020, Wah Pynkon Limestone (13.58 Ha)
- MPL 8 MW_EC_Compliance Report (Oct -’19 – Mar ’20)
- Six Monthly EC Compliance for the period October 2019 to March 2020
- Annexure I – Consent to operate
- Annexure II – AAQM equipments calibration certificates
- Annexure II A – Stack monitoring report
- Annexure II B – Ambient air quality monitoring report
- Annexure II C – Ambient noise level monitoring report
- Annexure II D – Fugitive emission analysis report
- Annexure II E – Water analysis report
- Annexure III – Photograph of water sprinking & road sweeper march
- Annexure IV – Plantation details & greenbelt photograph
- Annexure V (CREP)
- Annexure VI – Photograph of 13 nos. of rain water harvesting pit
- Annexure VII – Half Yearly medical check-up report
- Annexure VIII – Ground water test report & water level data
- Inhouse Monitoring Report
- Monthly Environmental Monitoring Report – May-2020, MPL 1 X 43 MW, Lumshnong
- Monthly Environmental Monitoring Report – May-2020, Khub Mine (9.66 Ha)
- Monthly Environmental Monitoring Report – May-2020, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report – May-2020, SCL
- Monthly Environmental Monitoring Report – May-2020, SCML
- Monthly Environmental Monitoring Report – May-2020, Wah Pynkon Limestone (13.58 Ha)
- Monthly Environmental Monitoring Report – March-2020, MPL 1 X 43 MW, Lumshnong
- Monthly Environmental Monitoring Report – March-2020, Khub Mine (9.66 Ha)
- Monthly Environmental Monitoring Report – March-2020, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report – March-2020, SCL
- Monthly Environmental Monitoring Report – March-2020, SCML
- Monthly Environmental Monitoring Report – March-2020, Wah Pynkon Limestone (13.58 Ha)
- Monthly Environmental Monitoring Report – February-2020, MPL 1 X 43 MW, Lumshnong
- Monthly Environmental Monitoring Report – February-2020, Khub Mine (9.66 Ha)
- Monthly Environmental Monitoring Report – February-2020, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report – February-2020, SCL
- Monthly Environmental Monitoring Report – February-2020, SCML
- Monthly Environmental Monitoring Report – February-2020, Wah Pynkon Limestone (13.58 Ha)
- Monthly Environmental Monitoring Report – January-2020, MPL 1 X 43 MW, Lumshnong
- Monthly Environmental Monitoring Report – January-2020, Khub Mine (9.66 Ha)
- Monthly Environmental Monitoring Report – January-2020, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report – January-2020, SCL
- Monthly Environmental Monitoring Report – January-2020, SCML
- Monthly Environmental Monitoring Report – January-2020, Wah Pynkon Limestone (13.58 Ha)
- Environmental Monitoring Report – December-2019, MPL 1 X 43 MW, Lumshnong
- Monthly Environmental Monitoring Report December-2019, Khub Mine (9.66 Ha)
- Monthly Environmental Monitoring Report December-2019, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report December-2019, SCL
- Monthly Environmental Monitoring Report December-2019, SCML
- Monthly Environmental Monitoring Report December-2019, Wah Pynkon Limestone (13.58 Ha)
- Environment Statement_Wah Pynkon_Limestone Mine 13.58 Ha (April 2018 to March 2019)Environment Statement_Wah Pynkon Limestone Mine 4.85 Ha (April 2018 to March 2019)
- Environment Statement_SCML (April 2018 to March 2019)
- Environment Statement_SCL (April 2018 to March 2019)
- Environment Statement_MTEPL (April 2018 to March 2019)
- Environment Statement_MPL_43MW (April 2018 to March 2019)
- Environment Statement_MPL_8MW (April 2018 to March 2019)
- Environment Statement_Limestone Mines 70.0 Ha (April 2018 to March 2019)
- Environment Statement_Khub-II 4.70 Ha (April 2018 to March 2019)
- Environment Statement_Khub-I 4.96 Ha (April 2018 to March 2019)
- Monthly Environmental Monitoring Report, November-2019, Wah Pynkon Limestone Mines (13.58 Ha)
- Monthly Environmental Monitoring Report, November-2019, SCML
- Monthly Environmental Monitoring Report, November-2019, SCL
- Monthly Environmental Monitoring Report, November-2019, MPL 1 x 43 MW
- Monthly Environmental Monitoring Report, November-2019, Limestone Mines (70.00 Ha)
- Monthly Environmental Monitoring Report, November-2019, Khub Limestone Mines (9.66 Ha)
- Monthly Environmental Monitoring Report, October-2019, Wah Pynkon Limestone Mines (13.58 Ha)
- Monthly Environmental Monitoring Report, October-2019, SCML
- Monthly Environmental Monitoring Report, October-2019, SCL
- Monthly Environmental Monitoring Report, October-2019, MPL 1 x 43 MW
- Monthly Environmental Monitoring Report, October-2019, Limestone Mines (70.00 Ha)
- Monthly Environmental Monitoring Report, October-2019, Khub Mines (9.66 Ha)
- Monthly Environmental Monitoring Report, September-2019, Wah Pynkon Limestone Mines (13.58 Ha)
- Monthly Environmental Monitoring Report, September-2019, SCML
- Monthly Environmental Monitoring Report, September-2019, SCL
- Monthly Environmental Monitoring Report, September-2019, MPL 1 x 43 MW
- Monthly Environmental Monitoring Report, September-2019, Limestone Mines (70.00 Ha)
- Monthly Environmental Monitoring Report, September-2019, Khub Limestone Mines (9.66 Ha)
- Monthly Environmental Monitoring Report, Ausust-2019, Wah Pynkon Limestone (70.00 Ha)
- Monthly Environmental Monitoring Report, August-2019, Wah Pynkon Limestone (13.58 Ha)
- Monthly Environmental Monitoring Report, August-2019, SCML
- Monthly Environmental Monitoring Report, August-2019, SCL
- Monthly Environmental Monitoring Report, August-2019, MPL 1 X 43 MW
- Monthly Environmental Monitoring Report, August-2019, Khub Limestone Mines (9.66 Ha)
- Six Monthly EC Compliance Report SCL (GGU) for the month of Apr ’19 to Sep ’19
- Six Monthly EC Compliance Report SCL (GGU) for the month of Apr ’19 to Sep ’19 – Annexure I – Consent to operate
- Six Monthly EC Compliance Report SCL (GGU) for the month of Apr ’19 to Sep ’19 – Annexure II A – Stack Monitoring Report
- Six Monthly EC Compliance Report SCL (GGU) for the month of Apr ’19 to Sep ’19 – Annexure II B – Ambient Air Quality Monitoring Report
- Six Monthly EC Compliance Report SCL (GGU) for the month of Apr ’19 to Sep ’19 – Annexure II C – Ambient Noise Level Monitoring Report
- Six Monthly EC Compliance Report SCL (GGU) for the month of Apr ’19 to Sep ’19 – Annexure II D – Fugitive Emission Analysis Report
- Six Monthly EC Compliance Report SCL (GGU) for the month of Apr ’19 to Sep ’19 – Annexure II E – Water Analysis Report
- Six Monthly EC Compliance Report SCL (GGU) for the month of Apr ’19 to Sep ’19 – Annexure III
- Six Monthly EC Compliance Report SCL (GGU) for the month of Apr ’19 to Sep ’19 – Annexure IV – Greenbelt Details
- Six Monthly EC Compliance Report SCL (GGU) for the month of Apr ’19 to Sep ’19 – Annexure V – CREP
- Six Monthly EC Compliance Report SCL (GGU) for the month of Apr ’19 to Sep ’19 – Annexure VI – Photograph of 13 nos. of Rain Water Harvesting Pit
- Six Monthly EC Compliance Report SCL (GGU) for the month of Apr ’19 to Sep ’19 – Annexure VII – Half Yearly Medical Check-up report with photograph – copy
- Six Monthly EC Compliance Report SCL (GGU) for the month of Apr ’19 to Sep ’19 – Annexure VIII – NOC for CGWB, Ground Water Test Report, Water Lev – Copy
- SCL (GGU) – Inhouse Test Report
- Monthly Environmental Monitoring Report, July-2019, Wah Pynkon Limestone (13.58 Ha)
- Monthly Environmental Monitoring Report, July-2019, SCML
- Monthly Environmental Monitoring Report, July-2019, SCL
- Monthly Environmental Monitoring Report, July-2019, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, July-2019, Khub Mine (9.66 Ha)
- Environmental Monitoring Report, July-2019, MPL 1X43 MW, Lumshnong
- Monthly Environmental Monitoring Report, June-2019, Wah Pynkon Limestone (13.58 Ha)
- Monthly Environmental Monitoring Report, June-2019, SCML
- Monthly Environmental Monitoring Report, June-2019, SCL
- Monthly Environmental Monitoring Report, June-2019, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, June-2019, Khub Mine (9.66 Ha)
- Environmental Monitoring Report, June-2019, MPL 1X43 MW, Lumshnong
- Six Monthly EC Compliance for SCML (Oct ’18 to Mar ’19)
- Six Monthly EC Compliance for SCL (Oct ’18 to Mar ’19)
- Six Monthly EC Compliance for MPL-43 MW (Oct’18 to Mar ’19)
- Six Monthly EC Compliance for MPL-8 MW (Oct ’18 to Mar ’19)
- Six Monthly EC Compliance for 70.00 Ha (Oct ’18 to Mar ’19)
- Six Monthly EC Compliance for 13.58 Ha (Oct ’18 to Mar ’19)
- Six Monthly EC Compliance for 9.66 Ha (Oct ’18 to Mar ’19)
- Monthly Environmental Monitoring Report, May-2019, Wah Pynkon Limestone (13.58 Ha)
- Monthly Environmental Monitoring Report, May-2019, SCML
- Monthly Environmental Monitoring Report, May-2019, SCL
- Monthly Environmental Monitoring Report, May-2019, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, May-2019, Khub Mine (9.66 Ha)
- Environmental Monitoring Report, May-2019, MPL 1X43 MW, Lumshnong
- Monthly Environmental Monitoring Report, April-2019, Wah Pynkon Limestone (13.58 Ha)
- Monthly Enviornmental Monitoring Report, April-2019, SCML
- Monthly Environmental Monitoring Report, April-2019, SCL
- Monthly Environmental Monitoring Report, April-2019, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, April-2019, Khub Mine (9.66 Ha)
- Environmental Monitoring Report, April-2019, MPL 1X43 MW, Lumshnong
- Monthly Environmental Monitoring Report, March-2019, Wah Pynkon Limestone (13.58 Ha)
- Monthly Environmental Monitoring Report, March-2019, SCML
- Monthly Environmental Monitoring Report, March-2019, SCL
- Monthly Environmental Monitoring Report, March-2019, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, March-2019, Khub Mine (9.66 Ha)
- Environmental Monitoring Report, March-2019, MPL 1X43 MW, Lumshnong
- Monthly Environmental Monitoring Report, February-2019, Wah Pynkon Limestone (13.58 Ha)
- Monthly Environmental Monitoring Report, February-2019, SCML
- Monthly Environmental Monitoring Report, February-2019, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, February-2019, Khub Mine (9.66 Ha)
- Monthly Environmental Monitoring Report, February-2019, February-2019,SCL
- Environmental Monitoring Report, February-2019, MPL 1X43 MW, Lumshnong
- Monthly Environmental Monitoring Report, January-2019, Wah Pynkon Limestone (13.58 Ha)
- Monthly Environmental Monitoring Report, January-2019, SCML
- Monthly Environmental Monitoring Report, January-2019, SCL
- Monthly Environmental Monitoring Report, January-2019, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, January-2019,Khub Mine (9.66 Ha)
- Environmental Monitoring Report-January-2019, MPL 1X43 MW, Lumshnong
- SCML-Monthly Environmental Monitoring Report, December-2018, SCML
- SCL-Monthly Environmental Monitoring Report, December-2018,SCL
- MPL-Environmental Monitoring Report, December-2018, MPL 1X43 MW, Lumshnong
- Mines-Monthly Environmental Monitoring Report, December-2018, Wah Pynkon Limestone (13.58 Ha)
- Mines-Monthly Environmental Monitoring Report, December-2018, Limestone Mines(70.0 Ha)
- Mines-Monthly Environmental Monitoring Report, December-2018, Khub Mine (9.66 Ha)
- Six Monthly EC Compliance Report of SCL (GGU) for the month of Oct ’18 to Mar ’19 – Part 1 – Annexure I
- Six Monthly EC Compliance Report of SCL (GGU) for the month of Oct ’18 to Mar ’19 – Part 1 – Annexure II
- Six Monthly EC Compliance Report of SCL (GGU) for the month of Oct ’18 to Mar ’19 – Part 1 – Annexure II A
- Six Monthly EC Compliance Report of SCL (GGU) for the month of Oct ’18 to Mar ’19 – Part 2 – Annexure II B
- Six Monthly EC Compliance Report of SCL (GGU) for the month of Oct ’18 to Mar ’19 – Part 2 – Annexure II C
- Six Monthly EC Compliance Report of SCL (GGU) for the month of Oct ’18 to Mar ’19 – Part 2 – Annexure II D
- Six Monthly EC Compliance Report of SCL (GGU) for the month of Oct ’18 to Mar ’19 – Part 3 – Annexure II E
- Six Monthly EC Compliance Report of SCL (GGU) for the month of Oct ’18 to Mar ’19 – Part 3 – Annexure III
- Six Monthly EC Compliance Report of SCL (GGU) for the month of Oct ’18 to Mar ’19 – Part 3 – Annexure IV
- Six Monthly EC Compliance Report of SCL (GGU) for the month of Oct ’18 to Mar ’19 – Part 4 – Annexure V
- Six Monthly EC Compliance Report of SCL (GGU) for the month of Oct ’18 to Mar ’19 – Part 4 – Annexure VI
- Six Monthly EC Compliance Report of SCL (GGU) for the month of Oct ’18 to Mar ’19 – Part 4 – Annexure VII
- Six Monthly EC Compliance Report of SCL (GGU) for the month of Oct ’18 to Mar ’19 – Part 5 – Annexure VIII
- Six Monthly EC Compliance Report of SCL (GGU) for the month of Oct ’18 to Mar ’19 – Part 5 – Received copy of EC
- Six Monthly EC Compliance Report of SCL (GGU) for the month of Oct ’18 to Mar ’19 – Part 6
- Six Monthly EC Compliance Report of SCL (GGU) for the month of April to September 2018 – Part 1
- Six Monthly EC Compliance Report of SCL (GGU) for the month of April to September 2018 – Part 2
- Six Monthly EC Compliance Report of SCL (GGU) for the month of April to September 2018 – Part 3
- Six Monthly EC Compliance Report of SCL (GGU) for the month of April to September 2018 – Part 4
- Six Monthly EC Compliance for 13.58 Ha. (Apr ’18-Sep ’18)
- Six Monthly EC Compliance for 9.66 Ha. (Apr ’18-Sep ’18)
- Six Monthly EC Compliance for 70.00 Ha. (Apr ’18-Sep ’18)
- Six Monthly EC Compliance Reports for SCML (Apr-Sep ’18) – Part 1
- Six Monthly EC Compliance Reports for SCML (Apr-Sep ’18) – Part 2
- Six Monthly EC Compliance for SCL (April ’18 to September ’18)
- Monthly Environmental Monitoring Report, November – 2018, Wah Pynkon Limestone ( 13.58 Ha)
- Monthly Environmental Monitoring Report, November – 2018, SCML
- Monthly Environmental Monitoring Report, November – 2018, SCL
- Monthly Environmental Monitoring Report, November – 2018, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, November – 2018, Khub Mines (9.66 Ha)
- Environmental Monitoring Report , November – 2018, MPL 1 X 43 MW, Lumshnong
- Monthly Environmental Monitoring Report, October-2018, Wah Pynkon Limestone (13.58 Ha)
- Monthly Environmental Monitoring Report, October-2018, SCML
- Monthly Environmental Monitoring Report, October-2018, SCL
- Monthly Environmental Monitoring Report, October-2018, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, October-2018, Khub Mines (9.66 Ha)
- Environmental Monitoring Report, October-2018, MPL 1 x 43 MW, Lumshnong
- Environmental Monitoring Report, September-2018, MPL 1X43 MW, Lumshnong
- Monthly Environmental Monitoring Report, September-2018, Khub Mines (9.66 Ha)
- Monthly Environmental Monitoring Report, September-2018, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, September-2018, SCL
- Monthly Environmental Monitoring Report, September-2018, SCML
- Monthly Environmental Monitoring Report, September-2018, Wah Pynkon Limestone (13.58 Ha)
- Six Monthly EC Compliance for SCML (Oct-17 to Mar-18)
- Monthly Environmental Monitoring Report, August-2018, Wah Pynkon Limestone (13.58 Ha)
- Monthly Environmental Monitoring Report, August-2018, SCML
- Monthly Environmental Monitoring Report, August-2018, SCL
- Monthly Environmental Monitoring Report, August-2018, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, August-2018, Khub Mines (9.66 Ha)
- Environmental Monitoring Report, August-2018, MPL 1X43 MW Lumshnong
- Monthly Environmental Monitoring Report, July-2018, Wah Pynkon Limestone (13.58 Ha)
- Monthly Environmental Monitoring Report, July-2018, SCML
- Monthly Environmental Monitoring Report, July-2018, SCL
- Monthly Environmental Monitoring Report, July-2018, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, July-2018, Khub Mines (9.66 Ha)
- Environmental Monitoring Report, July-2018, MPL 1X43 MW, Lumshnong
- Six Monthly EC Compliance for SCL (Oct-2017 to Mar-2018)
- Monthly Environmental Monitoring Report, June-2018, Wah Pynkon Limestone (13.58 Ha)
- Monthly Environmental Monitoring Report, June-2018, SCML
- Monthly Environmental Monitoring Report, June-2018, SCL
- Monthly Environmental Monitoring Report, June-2018, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, June-2018, Khub Mines (9.66 Ha)
- Environmental Monitoring Report, June-2018, MPL, 1×43 MW, Lumshnong
- Environmental Monitoring Report, May-2018, MPL, 1×43 MW Lumshnong
- Monthly Environmental Monitoring Report, May-2018, Khub Mines (9.66 Ha)
- Monthly Environmental Monitoring Report, May-2018, Limestone Mines (70.0 Ha)
- Monthly Environmental Monitoring Report, May-2018, SCL
- Monthly Environmental Monitoring Report, May-2018, SCML
- Monthly Environmental Monitoring Report, May-2018,Wah Pynkon Limestone (13.58 Ha)
- Six Monthly EC Compliance for 70.00 Ha (Oct ’17-Mar ’18)
- Six Monthly EC Compliance for 13.58 Ha (Oct ’17-Mar ’18)
- Six Monthly EC Compliance for 9.66 Ha (Oct ’17-Mar ’18)
- Monthly Environmental Monitoring Report, April-2018, Wan Pynkon Limestone (13.58 Ha)
- Monthly Environmental Monitoring Report, April-2018, SCML
- Monthly Environmental Monitoring Report, April-2018, SCL
- Monthly Environmental Monitoring Report, April-2018, Limestone Mines (70.00 Ha)
- Monthly Environmental Monitoring Report, April-2018, Khub Mines (9.66 Ha)
- Environment Monitoring Report, April-2018 (MPL 1×43 MW, Lumshnong)
- Environment Monitoring Report, March-2018 (MPL 1×43 MW, Lumshnong)
- Monthly Environmental Monitoring Report, March-2018, Limestone Mines (70.00 Ha)
- Monthly Environmental Monitoring Report, March-2018, Wah Pynkon Limestone Mine (13.58 Ha)
- Monthly Environmental Monitoring Report, March-2018, Khub Limestone Mine (9.66 Ha)
- Monthly Environmental Monitoring Report, March-2018, SCL
- Monthly Environmental Monitoring Report, March-2018, SCML
- Environmental Monitoring Report, February-2018 (MPL 1×43 MW, Lumshnong)
- Monthly Environmental Monitoring Report, February-2018, Limestone Mines (70.00 Ha)
- Monthly Environmental Monitoring Report, February-2018, Wah Pynkon Limestone Mine (70.00 Ha)
- Monthly Environmental Monitoring Report, February-2018, Khub Limestone Mine (9.66 Ha)
- Monthly Environmental Monitoring Report, February-2018, SCL
- Monthly Environmental Monitoring Report, February-2018, SCML
- Monthly Monitoring Report, January-2018 (MPL 1×43 MW, Lumshnong)
- Monthly Environmental Monitoring Report, January-2018, Limestone Mines (70.00 Ha)
- Monthly Environmental Monitoring Report, January-2018, Wah Pynkon Limestone Mine (13.58 Ha)
- Monthly Environmental Monitoring Report, January-2018, Khub Limestone Mine (9.66 Ha)
- Monthly Environmental Monitoring Report, January-2018, SCL
- Monthly Environmental Monitoring Report, January-2018, SCML
- EC Khub Limestone Mine 9.66 Ha
- EC 70.00 Ha
- EC 13.58 Ha
- Six Monthly EC Compliance for 9.66 Ha (April ’17 – September ’17)
- Six Monthly EC Compliance for 13.58 Ha (April ’17 – September ’17)
- Six Monthly EC Compliance for 70.00 Ha (April ’17 – September ’17)
- Monthly Environmental Monitoring Report – December – 2017, Khub Mines 9.66 Ha, Meghalaya
- Monthly Environmental Monitoring Report – Decmeber – 2017, MTEPL, Meghalaya
- Monthly Environmental Monitoring Report – December – 2017, SCL, Meghalaya
- Monthly Environmental Monitoring Report – December – 2017, SCML, Meghalaya
- Monthly Environmental Monitoring Report – December – 2017, MPL 1X43 MW, Lumshnong
- Monthly Environmental Monitoring Report – November – 2017, Khub Mines 9.66 Ha, Meghalaya
- Monthly Environmental Monitoring Report – November- 2017, MTEPL, Meghalaya
- Monthly Environmental Monitoring Report – November – 2017, SCL, Meghalaya
- Monthly Environmental Monitoring Report – November – 2017, SCML, Meghalaya
- Monthly Environmental Monitoring Report – November – 2017, MPL 1X43 MW, Lumshnong
- EC Compliance Report of SCL, Lumshnong from April-September 2017
- EC Compliance Report of SCML, Lumshnong from April-September 2017
- Monthly Environmental Monitoring Report – October – 2017, Khub Mines 9.66 Ha, Meghalaya
- Monthly Environmental Monitoring Report – October – 2017, MPL 1X43 MW, Lumshnong
- Monthly Environmental Monitoring Report – October – 2017, SCL, Meghalaya
- Monthly Environmental Monitoring Report – October – 2017, SCML, Meghalaya
- Monthly Environmental Monitoring Report – October – 2017, MTEPL, Meghalaya
- Monthly Environmental Monitoring Report – September – 2017 (SCML, Meghalaya)
- Monthly Environmental Monitoring Report – September – 2017 (SCL, Meghalaya)
- Monthly Environmental Monitoring Report – September – 2017 (MTEPL, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report – September – 2017 (MPL 1X43 MW, Lumshnong)
- Monthly Environmental Monitoring Report – September – 2017 (Khub Limestone Mines 9.66 Ha, Meghalaya)
- SCML Env. Statement 2016-2017
- SCL Env. Statement 2016-2017
- MPL (1X43 MW) Env. Statement 2016-2017
- Monthly Environmental Monitoring Report – August 2017 (SCL, Meghalaya)
- Monthly Environmental Monitoring Report – August 2017 (SCML, Meghalaya)
- Monthly Environmental Monitoring Report – August 2017 (MTEPL, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report – August 2017 (Khub Limestone Mines 9.66 Ha, Meghalaya)
- Environmental Monitoring Report August 2017 (MPL 1×43 MW, Lumshnong)
- Receipted copy of submission of Six Monthly compliance of EC, 70 Ha (Oct ’16-Mar ’17)
- Receipted copy of submission of Six Monthly compliance of EC, 70 Ha (Apr-Sep ’16)
- Receipted copy for the submission of EC Compliances for 13.58 Ha
- EC Compliance 9.66 ha Khub Limestone Mine
- Environmental Monitoring Report – July – 2017 (MPL 1X43 MW, Lumshnong)
- Monthly Environmental Monitoring Report – July – 2017 (Khub Limestone Mines, Meghalaya)
- Monthly Environmental Monitoring Report – July – 2017 (MTEPL, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report – July – 2017 (SCL, Meghalaya)
- Monthly Environmental Monitoring Report – July – 2017 (SCML, Meghalaya)
- Khub Limestone Mine’s Monthly Environmental Monitoring Report – June – 2017 (SCL, Meghalaya)
- Monthly Environmental Monitoring Report – June – 2017 (SCML, Meghalaya)
- Monthly Environmental Monitoring Report – June – 2017 (SCL, Meghalaya)
- Monthly Environmental Monitoring Report – June – 2017 (MTEPL, Lumshnong, Meghalaya)
- EC Compliance Report of MPL 8 MW, Lumshnong from Oct ’16 to Mar ’17
- EC Compliance Report of MPL 43 MW, Lumshnong from Oct ’16 to Mar ’17
- Environmental Monitoring Report – June – 2017 (MPL 1X43 MW, Lumshnong)
- Monthly Environmental Monitoring Report – May 2017 (SCML, Meghalaya)
- Monthly Environmental Monitoring Report – May 2017 (MTEPL, Lumshnong, Meghalaya)
- Environmental Monitoring Report – May 2017 (MPL 1×43 MW, Lumshnong)
- EC for expansion of SCL
- EC Compliance Report of SCL, Lumshnong from Oct ’16 to Mar ’17
- EC Compliance Report of SCML, Lumshnong from Oct ’16 to Mar ’17
- Monthly Environmental Monitoring Report – April – 2017 (SCML, Meghalaya)
- Monthly Environmental Monitoring Report – April – 2017 (MTEPL, Lumshnong, Meghalaya)
- Environmental Monitoring Report – April – 2017 (MPL 1X43 MW, Lumshnong)
- EC of 70 ha. Limestone Mine of SCL
- Monthly Environmental Monitoring Report – March-2017 (MTEPL, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report – March-2017 (SCML, Meghalaya)
- Environmental Monitoring Report – March-2017 (MPL 1×43 MW, Lumshnong)
- Monthly Environmental Monitoring Report – February-2017 (MTEPL, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report – February-2017 (SCML, Meghalaya)
- Environmental Monitoring Report – February -2017 (MPL 1×43 MW, Lumshnong)
- Monthly Environmental Monitoring Report – January 2017 (SCML, Meghalaya)
- Monthly Environmental Monitoring Report – January 2017 (MTEPL, Lumshnong, Meghalaya)
- Environmental Monitoring Report – January 2017 (MPL 1×43 MW, Lumshnong)
- Monthly Environmental Monitoring Report – December 2016 (MTEPL, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report – December 2016 (SCML, Meghalaya)
- Environmental Monitoring Report – December 2016 (MPL 1×43 MW, Lumshnong)
- Monthly Environmental Monitoring Report – November 2016 (MTEPL, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report – November 2016 (SCML, Meghalaya)
- Environmental Monitoring Report – November-2016 (MPL 1×43 MW, Lumshnong)
- EC Compliance Report of MPL 43 MW, Lumshnong from April ’16 to Sep ’16
- EC Compliance Report of SCL, Lumshnong from April ’16 to Sep ’16
- EC Compliance Report of SCML, Lumshnong from April ’16 to Sep ’16
- EC Compliance Report of MPL 8 MW, Lumshnong from April ’16 to Sep ’16
- Monthly Environmental Monitoring Report – October 2016 (SCML, Meghalaya)
- Monthly Environmental Monitoring Report – October 2016 (MTEPL, Lumshnong, Meghalaya)
- Environmental Monitoring Report – October 2016 (MPL 1 x 43 MW,Lumshnong)
- SCML ENV STATEMENT – 2015-2016
- MPL (1X43 MW) ENV STATEMENT -2015-2016
- Environmental Monitoring Report September 2016 (MPL 1X43 MW, Lumshnong)
- Monthly Environmental Monitoring Report September 2016 (SCML, Meghalaya)
- Monthly Environmental Monitoring Report September 2016 (MTEPL, Lumshnong, Meghalaya)
- Environmental Monitoring Report August 2016 (MPL 1X43 MW, Lumshnong)
- Monthly Environmental Monitoring Report August 2016 (SCML, Meghalaya)
- Monthly Environmental Monitoring Report August 2016 (MTEPL, Lumshnong, Meghalaya)
- Environmental Monitoring Report July 2016 (MPL 1X43 MW, Lumshnong)
- Monthly Environmental Monitoring Report July 2016 (SCML, Meghalaya)
- Monthly Environmental Monitoring Report July 2016 (MTEPL, Lumshnong, Meghalaya)
- Environmental Monitoring Report June 2016 (MPL 1X43 MW, Lumshnong)
- Monthly Environmental Monitoring Report June 2016 (SCML, Meghalaya)
- Monthly Environmental Monitoring Report June 2016 (MTEPL, Lumshnong, Meghalaya)
- Environmental Monitoring Report May 2016 (MPL 1X43 MW, Lumshnong)
- Monthly Environmental Monitoring Report May 2016 (SCML, Meghalaya)
- Monthly Environmental Monitoring Report May 2016 (MTEPL, Lumshnong, Meghalaya)
- EC Compliance Report of CMCL, Lumshnong from April ’15 to September ’15
- EC Compliance Report of MPL, Lumshnong from April ’15 to September ’15
- EC Compliance Report of SCML, Lumshnong from April ’15 to September ’15
- EC Compliance Report of CMCL, Lumshnong from October ’15 to March ’16
- EC Compliance Report of SCML, Lumshnong from October ’15 to March ’16
- EC Compliance Report of MPL 8 MW, Lumshnong from October ’15 to March ’16
- EC Compliance Report of MPL 43 MW, Lumshnong from October ’15 to March ’16
- Monthly Environmental Monitoring Report April 2016, SCML, Lumshnong
- Monthly Environmental Monitoring Report April 2016, MTEPL, Lumshnong
- Monthly Environmental Monitoring Report April 2016, MPL (1x43MW), Lumshnong
- Six Monthly Environmental Monitoring Report – MPL 43MW, Apr ’15 to Sep ’15
- EC for Expansion of Cement Manufacturing Co. Ltd.
- EC of MPL MW
- EC of SCML
- Meghalaya Power 8MW
- Six Monthly Compliance Report – GGU, Oct 2015
- Environmental Clearance – CMCL, Jalpaiguri, West Bengal
- Monthly Environmental Monitoring Report March 2016, MPL (1x43MW), Lumshnong
- Monthly Environmental Monitoring Report March 2016, MTEPL, Lumshnong
- Monthly Environmental Monitoring Report March 2016, SCML, Lumshnong
- Monthly Environmental Monitoring Report February 2016, MPL (1x43MW), Lumshnong
- Monthly Environmental Monitoring Report February 2016, MTEPL, Lumshnong
- Monthly Environmental Monitoring Report February 2016, SCML, Lumshnong
- Monthly Environmental Monitoring Report January 2016, MPL (1x43MW), Lumshnong
- Monthly Environmental Monitoring Report January 2016, MTEPL, Lumshnong
- Monthly Environmental Monitoring Report January 2016, SCML, Lumshnong
- Monthly Environmental Monitoring Report December 2015, MPL (1x43MW), Lumshnong
- Monthly Environmental Monitoring Report December 2015, MTEPL, Lumshnong
- Monthly Environmental Monitoring Report December 2015, SCML, Lumshnong
- Monthly Environmental Monitoring Report November 2015, MPL (1x43MW), Lumshnong
- Monthly Environmental Monitoring Report November 2015, MTEPL, Lumshnong
- Monthly Environmental Monitoring Report November 2015, SCML, Lumshnong
- Monthly Environmental Monitoring Report October 2015, MPL (1x43MW), Lumshnong
- Monthly Environmental Monitoring Report October 2015, MTEPL, Lumshnong
- Monthly Environmental Monitoring Report October 2015, SCML, Lumshnong
- Monthly Environmental Monitoring Report September 2015, MPL (1x43MW), Lumshnong
- Monthly Environmental Monitoring Report September 2015, MTEPL, Lumshnong
- Monthly Environmental Monitoring Report September 2015, SCML, Lumshnong
- Monthly Environmental Monitoring Report August 2015, MPL (1x43MW), Lumshnong
- Monthly Environmental Monitoring Report August 2015, MTEPL, Lumshnong
- Monthly Environmental Monitoring Report August 2015, SCML, Lumshnong
- Monthly Environmental Monitoring Report July 2015, MPL (1x43MW), Lumshnong
- Monthly Environmental Monitoring Report July 2015, MTEPL, Lumshnong
- Monthly Environmental Monitoring Report July 2015, SCML, Lumshnong
- Monthly Environmental Monitoring Report June 2015, MPL (1x43MW), Lumshnong
- Monthly Environmental Monitoring Report June 2015, MTEPL, Lumshnong
- Monthly Environmental Monitoring Report June 2015, SCML, Lumshnong
- Monthly Environmental Monitoring Report May 2015, MTEPL, Lumshnong
- Monthly Environmental Monitoring Report May 2015, MPL, Lumshnong
- Monthly Environmental Monitoring Report May 2015, SCML, Lumshnong
- EC Compliance Report of CMCL, Lumshnong from October ’14 to March ’15
- EC Compliance Report of SCML, Lumshnong from October ’14 to March ’15
- Environmental Monitoring Report-April 2015 (MPL 1×43 MW, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report-April 2015 (MTEPL, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report-April 2015 (SCML, Lumshnong, Meghalaya)
- Environmental Monitoring Report-March 2015 (MPL 1×43 MW, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report-March 2015 (MTEPL, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report-March 2015 (SCML, Lumshnong, Meghalaya)
- Environmental Monitoring Report-February 2015 (MPL 1×43 MW, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report-February 2015 (MTEPL, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report-February 2015 (SCML, Lumshnong, Meghalaya)
- Environmental Monitoring Report-January 2015 (MPL 1×43 MW, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report-January 2015 (SCML, Lumshnong, Meghalaya)
- Environmental Monitoring Report-December 2014 (MPL 1×43 MW, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report-December 2014 (SCML, Lumshnong, Meghalaya)
- Environmental Monitoring Report-November 2014 (MPL 1×43 MW, Lumshnong, Meghalaya)
- Monthly Environmental Monitoring Report-November 2014 (SCML, Lumshnong, Meghalaya)
- EC Compliance Report of SCML, Lumshnong from April 14 to Sep 14
- Receipt Letter from MoEF, CPCB & MSPCB reg Six Monthly EC Compliance Report of SCML
- EC Compliance Status Report of CMCL, Lumshnong from April 14 to Sep 14
- Receipt Letter ftom MoEF & SEIIA reg Six Monthly EC Compliance Report of CMCL
- Environmental Monitoring Report-Oct 14 (MPL 1X43MW, Lumshnong)
- Monthly Environmental Monitoring Report-Oct 14 (SCML, Lumshnong)
- Monthly Environmental Monitoring Report-Sep 14 (SCML, Lumshnong)
- Environmental Monitoring Report -Sep’14 (MPL 1X43MW, LUMSHNONG)
- Environmental Statement of CMCL, Lumshnong in FY 2013-14
- Environmental Statement of MTEPL, Lumshnong in FY 2013-14
- Environmental Statement of SCML, Lumshnong in FY 2013-14
- Environmental Monitoring Report – August 2014 (MPL 1X43 MW,Lumshnong)
- Monthly Environmental Monitoring Report – August 2014 (SCML,Meghalaya)
- Environmental Monitoring Report – July 2014 (MPL 1X43 MW,Lumshnong)
- Monthly Environmental Monitoring Report – July 2014 (SCML,Meghalaya)
- Six Monthly EC Compliance Status Report of SCML (5300 TPD Clinkerization Unit)- Jan to June 2014
- Six Monthly EC Compliance Status Report of CMCL (2400 TPD Cement Unit)- Jan to June 2014
- Environmental Monitoring Report – May 2014 (MPL 1X43 MW,Lumshnong)
- Monthly Environmental Monitoring Report – May 2014 (SCML,Meghalaya)
- Environmental Monitoring Report – April 2014 (MPL 1X43 MW,Lumshnong)
- Monthly Environmental Monitoring Report – April 2014 (SCML,Meghalaya)
- Environmental Monitoring Report – March 2014 (MPL 1X43 MW,Lumshnong)
- Monthly Environmental Monitoring Report – March 2014 (SCML,Meghalaya)
- Environmental Monitoring Report – February 2014 (MPL 1X43 MW,Lumshnong)
- Monthly Environmental Monitoring Report – February 2014 (SCML,Meghalaya)
- Environmental Monitoring Report – January 2014 (MPL 1X43 MW,Lumshnong)
- Monthly Environmental Monitoring Report – January 2014 (SCML,Meghalaya)
- EC Compliance Status Report – July to Dec 2013 (MPL 43 MW)
- Six Monthly EC Compliance Status of CMCL (2400 TPD Cement Plant) – July to Dec 2013
- Six Monthly SC Compliance Status of SCML (5300 TPD) Clinkerization
- EC Compliance Status Report-July to Dec 2013 (MPL 8 MW)
- Environmental Monitoring Report – September 2013 (SCML, Lumshnong)
- Environmental Monitoring Report – September 2013 (MPL 43 MW, Lumshnong)
- Environmental Monitoring Report – June 2013 (SCML, Lumshnong)
- Environmental Monitoring Report – (MPL 43 MW)-June 2013
- Six Monthly EC Compliance Status Of CMCL (2400 TPD Cement Plant) – Jan to June 2013
- Six Monthly EC Compliance Status Of SMCL (5300 TPD Clinkerization Unit) – Jan to June 2013
- Six Monthly Environmental Monitoring Report – Jan to June 2013 (CMCL, Lumshnong)
-
Six Monthly Compliance Report – June 2013 (CMCL, Guwahati Grinding Unit)
-
Stack Analysis Report – June 2013 (CMCL, Guwahati Grinding Unit)
-
Ambient Air Analysis Report – June 2013 (CMCL, Guwahati Grinding Unit)
-
Water Analysis Report – August 2013 (CMCL, Guwahati Grinding Unit)
-
Noise Level Measurement Analysis Report – June 2013 (CMCL, Guwahati Grinding Unit)